# Remodeling of GYM at the U.S. Embassy Marine House

Federal contract opportunity, via Kontrakk.

- **Agency:** STATE, DEPARTMENT OF.STATE, DEPARTMENT OF.US EMBASSY VIENNA
- **Notice ID:** 11b6afe92d85411aa785df10483d7769
- **Solicitation number:** 19AU9026Q0009
- **Notice type:** Presolicitation
- **NAICS:** 238390
- **Place of performance:** Vienna, AT-9
- **Posted:** June 11, 2026
- **Response deadline:** July 29, 2026
- **View on Kontrakk:** https://kontrakk.com/contracts/11b6afe92d85411aa785df10483d7769
- **View on SAM.gov:** https://sam.gov/workspace/contract/opp/11b6afe92d85411aa785df10483d7769/view

## Description

This project is for the remodeling of the Gym/Fitness room at the U.S. Embassy Marine House, located in 1190 Vienna.

The old room structures and surfaces need improvement and renovation. The existing GYM will be expanded from 55m2 to 62m2, and the bathroom and a wall-cabinet will be demolished for this purpose.

Scope of work: General Contractor for Construction work and Electrical Installation

Demolition

 
Temporary plasterboard dust wall with door.

 
Demolition of partition walls (10cm), incl. wall coverings, 2 wooden doors+ doorframes and 1 wooden cabinet, electrical installation and equipment, incl. removal and disposal.

 
Demolition, removal and disposal of the existing wall- and floor tiles and in the bathroom, existing sanitary items and equipment in the bathroom, including pipes, and the

 PVC flooring incl. glue.

 
Removal of 4 existing ceiling lights.

Refurbishment

 
Walls and ceiling: plaster, level, clean, prime, paint to cover, incl. 16m2 floor covering material.

 
Floor: Clean, grind and level the floor; New PVC flooring in the demolition area.

 
Delivery and assembly of 6 new ceiling lights in new position, Including switch, wiring, and integration into the existing system.

 
Final cleaning

Special requirements

 
The work will be carried out while the facility remains in operation and in the presence of the residents, who should not be disturbed during the construction work

 
USG Security regulations

 
Clearance process for employees, cars, material on site

 
Safety and protective measures

Execution periods

Indicative construction schedule: 5 weeks in fall 2026