Loading...
Loading...
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION.NATIONAL AERONAUTICS AND SPACE ADMINISTRATION.NASA SHARED SERVICES CENTER
Washington, DC
No detailed description available
Posted Date
Sep 16, 2026 12:00 AM
Response Deadline
Sep 21, 2026 6:00 PM
See who won similar contracts and for how much — available with a Kontrakk Pro account.
Sign upGenerate professional outreach emails in seconds.
Generate proposals instantly
Sign up to create Kontrakk-powered outreach emails and send via Gmail, Outlook, or Yahoo.
Sign upPrototype Operational Modeling Framework for Manifest Feasibility in support of NASA KSC Spaceport Digital Twin
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION.NATIONAL AERONAUTICS AND SPACE ADMINISTRATION.NASA SHARED SERVICES CENTER
Due Sep 18, 2026
MIT Collaborative Research
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION.NATIONAL AERONAUTICS AND SPACE ADMINISTRATION.NASA SHARED SERVICES CENTER
Due Sep 17, 2026
Radio-Frequency (RF) Systems for the Electron Ion Collider (EIC)
ENERGY, DEPARTMENT OF.ENERGY, DEPARTMENT OF.BROOKHAVEN NATL LAB -DOE CONTRACTOR
Due Sep 16, 2026
Completion, validation, and Spaceport Digital Twin (SDT) integration of the existing prototype SUMO-based Spaceport Traffic Model in support of NASA Kennedy Space Center (KSC), Spaceport Integration & Services (SI) Directorate
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION.NATIONAL AERONAUTICS AND SPACE ADMINISTRATION.NASA SHARED SERVICES CENTER
Due Sep 8, 2026
Dynamic Genome: Mitochondrial CHIP Calling
HEALTH AND HUMAN SERVICES, DEPARTMENT OF.NATIONAL INSTITUTES OF HEALTH.NATIONAL INSTITUTES OF HEALTH OLAO
Due Sep 4, 2026